What is an ingress protection rating? What do the different IP ratings signify?
The IP (Ingress Protection) rating system was developed by the IEC (International Electrotechnical Commission) and classifies electrical equipment based on its ability to protect against dust and solid foreign objects—including tools and human fingers—so that these objects cannot come into contact with live parts inside the equipment, thereby preventing electric shock.
Ingress protection and resistance to moisture and water intrusion are classified according to specific ratings. The IP rating consists of two digits: the first digit indicates the degree of protection against dust and solid object intrusion, while the second digit indicates the degree of protection against moisture and water ingress. The higher the digit, the greater the level of protection.
IP dustproof rating: the meaning of the first digit:
|
Number |
Scope of Protection |
Explanation |
|
0 |
No protection |
No special protection against external people or objects. |
|
1 |
Prevent the ingress of solid objects with a diameter greater than 50 mm. |
Prevents accidental contact by the human body (e.g., the palm) with internal components of electrical equipment, and prevents the ingress of external objects of larger dimensions (diameter greater than 50 mm). |
|
2 |
Prevent the ingress of solid objects with a diameter greater than 12.5 mm. |
Prevents human fingers from coming into contact with internal components of the electrical equipment and prevents the ingress of foreign objects of medium size (diameter greater than 12.5 mm). |
|
3 |
Prevent the ingress of solid objects with a diameter greater than 2.5 mm. |
Prevent tools, wires, and similar small foreign objects with a diameter or thickness greater than 2.5 mm from entering and coming into contact with internal electrical components. |
|
4 |
Prevent the ingress of solid objects with a diameter greater than 1.0 mm. |
Prevent tools, wires, and similar small foreign objects with a diameter or thickness greater than 1.0 mm from entering and coming into contact with internal electrical components. |
|
5 |
Prevent foreign objects and dust |
It provides complete protection against the ingress of external objects; while it cannot completely prevent dust from entering, the amount of dust that does enter will not affect the normal operation of the electrical equipment. |
|
6 |
Prevent foreign objects and dust |
Completely prevents the ingress of foreign objects and dust. |
IP waterproof rating: the meaning of the second digit:
|
Number |
Scope of Protection |
Explanation |
|
0 |
No protection |
No special protection against water or moisture. |
|
1 |
Prevent water droplets from entering |
Vertically falling water droplets (such as condensation) will not damage electrical appliances. |
|
2 |
Even when tilted at 15 degrees, water droplets are still prevented from entering. |
When the appliance is tilted vertically by up to 15 degrees, dripping water will not cause damage to the appliance. |
|
3 |
Prevent sprayed water from entering |
Protection against rain or water sprayed from directions with a vertical angle of less than 60 degrees, to prevent such water from entering the electrical equipment and causing damage. |
|
4 |
Prevent splashing water from entering |
Prevent water splashing from all directions from entering electrical appliances and causing damage. |
|
5 |
Prevent water from spraying in |
Prevent water sprayed from nozzles in all directions from entering the electrical equipment and causing damage. |
|
6 |
Prevent large waves from flooding in |
Electrical equipment installed on the deck is designed to prevent damage caused by heavy waves. |
|
7 |
Prevent water from entering during immersion. |
When electrical appliances are immersed in water for a specified duration or subjected to water pressure below a certain threshold, they can be ensured not to be damaged by immersion. |
|
8 |
Preventing water ingress during sinking |
The electrical appliance is submerged indefinitely under the specified water pressure, ensuring that it will not be damaged by immersion. |
What is the motor duty cycle? What do S1, S2, and S3 mean?
The motor duty cycle specifies the allowable operating cycles under different loads.
The service duty of electric motors is classified as S1 to S10; specifically, the classification of a motor’s service duty describes the conditions under which the motor is subjected to load, including starting, electric braking, no-load operation, power-off stall, as well as the duration and sequence of these phases. The service duties are divided into the following 10 categories:
1. S1 continuous duty: The operating time under constant load is sufficient to achieve thermal stability;
2. S2 Short-Time Duty: The motor operates under a constant load for a specified duration that is insufficient to achieve thermal steady state, after which it is de-energized and allowed to coast to a standstill for a sufficient period to cool down until the temperature difference between the motor and the cooling medium is within 2 K.
3. S3 Intermittent Cycle Service: Operation is performed in a series of identical work cycles, each consisting of a period of constant-load operation and a period of power-off and standstill. Under this service mode, the starting current of each cycle does not have a significant impact on temperature rise;
4. S4 includes the intermittent cyclic duty cycle for starting: operation is performed in a series of identical work cycles, each consisting of a start-up period that has a significant impact on temperature rise, a constant-load running period, and a de-energized coasting period.
5. S5 includes the intermittent cyclic duty cycle with electric braking: operation is performed according to a series of identical work cycles, each cycle comprising a start-up period, a constant-load running period, a rapid electric-braking period, and a de-energized coasting period.
6. S6 Continuous cyclic duty: Operation is performed in a series of identical work cycles, each consisting of a period of constant-load operation and a period of no-load operation, with no power-off stop time.
7. S7 includes continuous cyclic operation with electric braking: the motor operates in a series of identical duty cycles, each consisting of a start-up period, a constant-load running period, and a rapid electric-braking period, with no interval for complete power-off and standstill.
8. S8 encompasses continuous cyclic operation under variable speed and variable load: the machine operates according to a series of identical work cycles, each cycle consisting of a period of constant-load operation at a predetermined speed, followed by one or more periods of constant-load operation at different speeds, with no interval of power-off or standstill.
9. S9 Non-periodic Load and Speed Variation Service: A non-periodic service in which the load and speed vary within permissible limits. This service includes frequent overloads, the magnitude of which may far exceed the full-load rating;
10. S10 Discrete Constant-Load Duty Cycle: This duty cycle includes no fewer than four discrete load levels (or equivalent loads), with the operating time for each load level sufficient to allow the motor to reach thermal steady state; the minimum load level within a single duty cycle may be zero.
In addition to being designated by the corresponding codes S1 through S10, the type of duty cycle shall also comply with the following provisions:
For the S2 duty cycle, the duty duration shall be appended after the designation S2; for the S3 and S6 duty cycles, the load duty cycle shall be appended after the designation. For example: S2–60 min, S3–25%, S6–40%. For the S4 and S5 duty cycles, the load duty cycle, the motor’s moment of inertia Jm, and the load’s moment of inertia Jext shall be appended after the designation.
The moments of inertia are both expressed as values referred to the motor shaft. For the S7 duty cycle, the code shall be followed by the motor’s moment of inertia Jm and the load’s moment of inertia, both expressed as values referred to the motor shaft. For the S10 duty cycle, the code shall be followed by the nominal values of the corresponding load and its duration.